Warehouse complex
year
2021-2022
property location
Kyiv city
completed work
Completed the whole complex of general construction works for the building of two warehouse facilities with a total building area of 2700 m²: - earthworks - foundation construction - manufacture and installation of metal structures (110 t) - mounting of sandwich panels - installation of industrial floor
project features











Others projects
Construction of a warehouse complex
Construction of a warehouse building with an area of 2300 m².
Engineering of working documentation for Detailed Metal Construction Drawings. Manufacturing and installation of metal structures of the frame of the complex with a total capacity of 60 tons.

Antenna-feeder devices on the state border of Ukraine
For this project, we completed 15 sets of prefabricated metal structures with a total height of 29 meters, which were additionally attached to a 26-meter concrete support.
The height of total structure is 32 meters above ground level.
All metal elements were hot-dip galvanized using a special technology.
The term of production of the order – 20 calendar days.

Reconstruction of a residential building
Reconstruction of a residential building. Production and installation of metal structures with a total of 50 tons with fire protection application.

Outdoor Fire Escape for Business Center
Manufacturing of an external fire escape for the Business Center on the Lipkovsky street, in Kyiv city. We fabricated and assembled metal structures with a total amount of 25 tons. In the final version, it is planned to additionally paint the stairs black.

Parking lots near the new residential complex
Engineering of working documentation for Detailed Metal Construction Drawings. Production of metal structures for parking lots in the total amount of 33 tons.

Elevator complex for grain processing
Project for the construction of an elevator complex for grain processing. Our plant produced 220 tons of steel structures for it. We performed a full range of works, including the engineering of a Detailed Metal Construction Drawings, the manufacturing and installation of metal structures for a transport gallery (at a height of 45 m), elevator towers, a blockage pit and other operational structures. We also performed the works on sandwich panels’ installation at the facility.