completed work

Our company acted as the general contractor at this facility. We designed a complex with an area of 4140 m2. After that, we launched parallel preparation of the site for construction with foundation works and production of metal structures at our plant. This made it possible to shorten the overall construction period. The total tonnage of the frame structures was 180 tons.

project features

Others projects