Construction of a store from metal structures in Odesa city
year
2021
property location
Odesa city
completed work
Construction of a store in Odesa city. Previously, it was a warehouse, which we rebuilt into a retail space. For this object, we manufactured and assembled 36 tons of metal structures. Sandwich panels with an area of 1500 sq.m. are currently being actively installed.
project features
Others projects
Construction of a production building of 3456m2
In the Kyiv region, we built a production facility with a total area of 3456 m2. Our plant produced 130 tons of metal structures for this facility, which were installed in 18 days.
Building an underground shelter
We developed a project of individual shelter for employees of the enterprise. With a capacity of up to 100 people. This shelter consists of a reinforced metal container, additionally protected by a concrete slab. The shelter itself is also installed on a prepared concrete slab. After the completion of installation work, all necessary life support systems (electricity, water, ventilation, generators) were connected
Industrial building with administrative building extension
Construction of an industrial building with an extension to the administrative building. Total area – 700 sq.m. A special feature of this construction was the customer’s desire to illuminate the building with daylight as much as possible. The solution to this problem was the introduction of translucent sandwich panels in compositions with roofing panels.
Preparation and installation of equipment to the business center
We have created a robotic complex: design, preparation and installation of metal structures above the building and business center. The peculiarity of this everyday life was that part of it had already been awakened. We had the opportunity to master all the technical features and parameters in a timely manner so that the final result would be on par.
Construction of the 3rd stage of tennis courts, “Vihola”
Our company acted as the general contractor at this facility. We designed a complex with an area of 4140 m2. After that, we launched parallel preparation of the site for construction with foundation works and production of metal structures at our plant. This made it possible to shorten the overall construction period. The total tonnage of the frame structures was 180 tons.
Construction of cereal production with auxiliary buildings
Construction of a cereal production with auxiliary buildings and structures in the Cherkasy region. Our plant has produced 113 tons of metal structures, and a team of Pulsar Construction builders is installing them and installing sandwich panels of the production workshop and enclosing structures over the dam pits.