- Construction
- Production of metal structures
- Engineering
- Detailed Metal Structures Drawings
- Engineering of metal structures
- Engineering of warehouse complexes
- Metal Construction Drawings
- Engineering of elevators
- Engineering of industrial buildings
- Engineering of logistics complexes
- Engineering of agro-industrial complexes
- Engineering of agricultural objects
- Engineering of offices and office buildings
- Construction materials
- Projects
- News
Construction of a bakery Kulinichi
year
2022
property location
Lviv region
completed work
The production and construction company Pulsar Construction, using the capacities of its plant, manufactured more than 900 tons of metal structures for the frame of the future Kulinichi bakery in the Lviv region. The structures were made using modern technologies and high quality materials. This made it possible to ensure that the metal structures meet all the requested quality and certification standards.
project features
- a large volume of structures manufactured in a short time - compliance with the deadlines of the general contractor
Others projects
Stadium construction in Kyiv region
General contract for the construction of a two-story building
Construction of a production building of 3456m2
In the Kyiv region, we built a production facility with a total area of 3456 m2. Our plant produced 130 tons of metal structures for this facility, which were installed in 18 days.
Building an underground shelter
We developed a project of individual shelter for employees of the enterprise. With a capacity of up to 100 people. This shelter consists of a reinforced metal container, additionally protected by a concrete slab. The shelter itself is also installed on a prepared concrete slab. After the completion of installation work, all necessary life support systems (electricity, water, ventilation, generators) were connected
Industrial building with administrative building extension
Construction of an industrial building with an extension to the administrative building. Total area – 700 sq.m. A special feature of this construction was the customer’s desire to illuminate the building with daylight as much as possible. The solution to this problem was the introduction of translucent sandwich panels in compositions with roofing panels.
Preparation and installation of equipment to the business center
We have created a robotic complex: design, preparation and installation of metal structures above the building and business center. The peculiarity of this everyday life was that part of it had already been awakened. We had the opportunity to master all the technical features and parameters in a timely manner so that the final result would be on par.