- Construction
- Production of metal structures
- Engineering
- Detailed Metal Structures Drawings
- Engineering of metal structures
- Engineering of warehouse complexes
- Metal Construction Drawings
- Engineering of elevators
- Engineering of industrial buildings
- Engineering of logistics complexes
- Engineering of agro-industrial complexes
- Engineering of agricultural objects
- Engineering of offices and office buildings
- Construction materials
- Projects
- News
Antenna-feeder devices on the state border of Ukraine
year
2019
property location
completed work
For this project, we completed 15 sets of prefabricated metal structures with a total height of 29 meters, which were additionally attached to a 26-meter concrete support. The height of total structure is 32 meters above ground level. All metal elements were hot-dip galvanized using a special technology. The term of production of the order - 20 calendar days.
project features
Others projects
Stadium construction in Kyiv region
General contract for the construction of a two-story building
Construction of a production building of 3456m2
In the Kyiv region, we built a production facility with a total area of 3456 m2. Our plant produced 130 tons of metal structures for this facility, which were installed in 18 days.
Building an underground shelter
We developed a project of individual shelter for employees of the enterprise. With a capacity of up to 100 people. This shelter consists of a reinforced metal container, additionally protected by a concrete slab. The shelter itself is also installed on a prepared concrete slab. After the completion of installation work, all necessary life support systems (electricity, water, ventilation, generators) were connected
Industrial building with administrative building extension
Construction of an industrial building with an extension to the administrative building. Total area – 700 sq.m. A special feature of this construction was the customer’s desire to illuminate the building with daylight as much as possible. The solution to this problem was the introduction of translucent sandwich panels in compositions with roofing panels.
Preparation and installation of equipment to the business center
We have created a robotic complex: design, preparation and installation of metal structures above the building and business center. The peculiarity of this everyday life was that part of it had already been awakened. We had the opportunity to master all the technical features and parameters in a timely manner so that the final result would be on par.