Construction of a shock freezing complex for berries and vegetables

16.03.2021
facebook

We continue works on the construction of a complex in the Zhytomyr region.

The construction began in November 2020.
Implemented the following sections of the project:
– vertical layout;
– earthworks;
– installation of socket-type foundations;

– installation of the basement wall;
– manufacture and installation of metal structures (Anticorrosive protection coating system from one of the leading manufacturers of paint and varnish materials “TIKKURILLA” TM);

– roofing of the building.

Manufactured and assembled 270 tons of metal structures. Production – 40 calendar days. Installation – 45 calendar days.
Works on the installation of the industrial flooring have started.